Subscribe to RSSTHe Week
Mother, daughter thrashed on witchcraft charge
Govt still undecided over proposed NA general directorate
250 trucks stranded as govt restricts excavation, exports of river products
Sula's wines now in Nepal
Framing the floor
A wake-up call
Lessons from Lanka
My Republica e-Paper.
Market
  Forex
  Stocks
 
Phalano by Rajesh KC
Cartoon Archive »  

Archives
  Daily News
  Photo Gallery
Sunday WEATHER
KATHMANDU
Thunderstorms
Low 18oC
High 26oC
Sunrise 5:10 am
Sunset 6:49 pm
 
 
  Spurs in Gandak dam not prepared yet  
 

RSS

PARASI, Jan. 24: The reconstruction of the spurs of the Gandak Dam in Nawalparasi, which were damaged in the floods, has not been started yet.

The Spur Nos. 11 and 12 of the B Gap of the dam in Nawalparasi were damaged by floods last year.

If they are not repaired, the remaining part of them will be damaged and at least some 13 VDCs will be in danger of inundation. Although Prime Minister Dr. Baburam Bhattarai had assured to immediately construct them after inspecting, it has not been started, said water resource campaigner Kuldip Acharya.

The water is still cutting the spurs. Even if India had made embankment during the floods, it has not started reconstruction, said Secretary of the Gandak River Control Struggle Committee Dudhnath Gupta.

Locals have demanded repair as southern VDCs will be inundated in the summer season.

A total of 13 VDCs are under threat, said Paklihawa local Suresh Yadav. India has not shown any concern even if demand had been made with Indian government for the same. Southern VDC Narsahi, Kudiya, Pratappur, among others, will be inundated if not repaired.

Struggle Committee Secretary Prem Chandra Gupta said the spurs were damaged as river current is near them.

The spurs earlier 163 meters long are now only 25 meters but no one has cared to repair, he said.

 
Published on 2013-01-24 16:26:31
# # [Facebook] [Slashdot] [Digg] [Reddit] [del.icio.us] [Technorati] [Google] [StumbleUpon]

 
 

PLEASE DESIST FROM ATTACKING THE WRITER PERSONALLY AND BE RESPECTFUL TO OTHER READERS.

Please give your full name while posting your comments. This is not to stifle the free flow of comments but your full name will enable us to print the comments in our newspaper.

 

Spurs In Gandak Dam Not Prepared Yet
Comment on this news #
Name
Email
Comments
   
832
 
   
 
 
Related News
More on Latest Briefs
About us  |  Contact us  |  Advertise with us  |  Career   |  Terms of use  |  Privacy policy
 
Copyright © Nepal Republic Media Pvt. Ltd. 2008-10.